Factory Alterations, Newry
PROJECT OVERVIEW
Crilco Confectionary Co based in Newry engaged Mac Construction to install a new production unit and sugar silo at their existing factory.
Scope of works:
Enabling works, including diversion of live services (electric, telecoms, gas, steam, water and drainage)
Partial demolition of the live factory
Rock excavations to install 150m3 RC foundation for 70T sugar silo.
Complete supply and fit installation of 418m2 purpose-built production unit including:
reduced dig and disposal
foundations
erecting steel work and cladding
block work and RC floor
carpark installation and landscaping
Mac Construction managed the factory closure and delivered outstanding results despite difficult site conditions and time constraints. Our team exceeded client expectations and delivered all works to a high standard and within the required time frame.